Tasks
A task is a list item with a checkbox. The character in the checkbox is its state. A task can repeat on a schedule or a set time after each completion.
- [x] Draft the station contract- [/] Survey the pier sites [owner:: @mara]- [?] Get a quote for solar roofs- [-] Printed leaflets- [ ] Check the dock batteries [repeat:: every monday]States
Section titled “States”| Checkbox | State |
|---|---|
[ ] |
to do |
[/] |
in progress |
[x] |
done ([X] is read as done too) |
[-] |
cancelled |
[?] |
waiting or blocked |
- Only list items have a checkbox. A heading or a requirement cannot have
one; a heading can still be a task with
type:: task, and then its state comes from the tasks below it. - A parent’s state is rolled up from the tasks below it: done when all are done, in progress when any is in progress or done, cancelled when all are cancelled, to do otherwise. Cancelled tasks do not count.
- Cancelled tasks are left out of roll-up dates and progress, of the critical path and of people’s load, and are never late.
Other properties a task often has are due::, owner::, priority::
(4 urgent … 1 someday), progress:: and covers::; see
Known keys.
Repeating tasks
Section titled “Repeating tasks”A task with repeat:: repeats. It stays open ([ ]); ticking it records the
completion instead of closing it.
- [ ] Clean the docks [repeat:: every monday]- [ ] Rotate spare bikes [repeat:: every 2 weeks when done] last:: 2027-03-08- [ ] Pay the electricity bill [repeat:: every month on the 1st] due:: 2027-04-01The rule
Section titled “The rule”repeat:: takes one of:
- a Markwhen recurrence:
every monday,every 2 weeks,every weekday,every month on the 1st,every year,every day for 5 times,every 2 weeks until 2027-06-01; - a raw RFC 5545 RRULE:
FREQ=MONTHLY;BYDAY=1MO(anRRULE:prefix is allowed,DTSTARTis not).
A rule repeats on schedule. Add the suffix when done to count from the last
completion instead: every 2 weeks when done. A rule that cannot be read is
a bad-value error.
Ticking a repeating task
Section titled “Ticking a repeating task”Ticking a repeating task (in a view, or with an agent edit):
- keeps the line
[ ], - writes
last:: <today>, - and, if the task has
due::, moves it to the next occurrence.
The history of completions is the file’s git history. The exact rule for the
new due::, and what happens when a rule has ended, is described in
How Facet writes.
The next occurrence
Section titled “The next occurrence”Views show a repeating task at its next occurrence:
- its
due::, when it has one; - else, for a
when donerule,last::plus the interval; - else the next scheduled occurrence after
last::, counted fromstart::when the task has one; - a repeating task that was never done (no
last::) is due today.
A plain when done interval is calendar arithmetic like duration::: one
month after 31 January is the last day of February. Other rules follow
RFC 5545, where days that do not exist are skipped: a monthly rule on the
31st skips months without a 31st.
What repeating tasks do not do
Section titled “What repeating tasks do not do”- They have no bar in the Gantt: their next occurrence is shown instead.
- An
after::cannot point at them (bad-after-target), since they have no dates to come after. - They are never late and never count as a person’s load.